Skip to main content

An official website of the United States government

Here’s how you know

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

GSA Logo U.S. General Services Administration
    • Explore buy through us
    • Category management
    • Government property for sale or lease
      Toggle submenu
      • Personal property (tangible goods)
      • Real property (real estate and buildings) for public use
      • Real property sales
      • Vehicle sales
    • Products and services
      Toggle submenu
      • Facilities and construction
      • Human capital
      • Industrial products and services
      • Information technology
      • Office management
      • Professional services
      • Security and protection
      • Transportation and logistics services
      • Travel and lodging
    • Purchasing programs
      Toggle submenu
      • Multiple award schedule
      • SmartPay (charge card services)
      • Assisted acquisition
      • Commercial platforms
      • Emergency acquisition basic ordering agreements
      • Federal strategic sourcing initiative
      • Fleet management
      • HCaTS and HCaTS SB
      • OASIS and OASIS SB
      • Requisition programs
      • State and local programs
      • Technology programs
      • 8(a) set asides on GSA contracts
    • Shared services
      Toggle submenu
      • Charge cards and payments (SmartPay)
      • Disposal of excess property
      • Fleet management
      • Interagency invoicing (G-Invoicing)
      • Payroll services
      • Quality service management offices
      • Support services for CABs
      • Website and digital services

    Featured Topics

    • Schedules and GSA Advantage Governmentwide contracts for products and services at volume discount pricing.
    • Auctions Federal assets available via auction to the general public.
    • Explore sell to government
    • Step 1: Learn about government contracting
      Toggle submenu
      • Ways you can sell to government
      • How to access contract opportunities
      • Conduct market research
    • Step 2: Compete for a contract
      Toggle submenu
      • Register your business
      • Certify as a small business
      • Become a schedule holder
      • Market your business
      • Research active solicitations
      • Respond to a solicitation
      • What to expect during the award process
    • Step 3: Manage your contract
      Toggle submenu
      • Comply with contractual requirements
      • Handle contract modifications
      • Monitor past performance evaluations

    Featured Topics

    • Contract opportunities on SAM.gov Search current federal contract opportunities and procurement notices.
    • Forecast of contracting opportunities Anticipated contracts offered by GSA.
    • Vendor support center Research the federal market, report sales, and upload contract information.
    • Explore real estate
    • Design and construction
      Toggle submenu
      • 3D-4D building information modeling
      • Art in architecture | Fine arts
      • Computer-aided design standards
      • Commissioning
      • Design excellence
      • Engineering
      • Project management information system
      • Spatial data management
      • Prospectus thresholds
    • Facilities management
      Toggle submenu
      • Facilities operations
      • Security
      • Smart buildings
      • Tenant services
      • Utility services
      • Water quality management
    • Historic preservation
      Toggle submenu
      • Explore historic buildings
      • Heritage tourism
      • Historic preservation policy, tools and resources
      • Historic building stewardship
      • Videos, pictures, posters and more
    • NEPA implementation
    • Our properties
      Toggle submenu
      • Courthouse program
      • Land ports of entry
      • Lighthouses
      • Owned and leased properties
      • Prospectus library
      • Regional buildings
      • Renting property
      • Visiting public buildings
    • Real estate services
      Toggle submenu
      • Leasing
      • Real property disposal
      • Reimbursable services (RWA)
      • Rental policy and procedures
      • Site selection and relocation
      • For businesses seeking opportunities
      • For federal customers
      • For workers in federal buildings
      • Voice of the customer
    • Workplace
      Toggle submenu
      • Commercial coworking
      • Federal coworking

    Featured Topics - Real Estate

    • Historic preservation tools and resources Procedures for maintaining and repairing historic buildings.
    • Real property disposal Dispose or acquire excess federal real property including buildings or land.
    • Explore policy and regulations
    • Policy
      Toggle submenu
      • Acquisition management policy
      • Aviation management policy
      • Information technology policy
      • Real property management policy
      • Relocation management policy
      • Travel management policy
      • Vehicle management policy
    • Regulations
      Toggle submenu
      • Federal acquisition regulations
      • Federal management regulations
      • Federal travel regulations
      • GSA acquisition manual
      • Managing the federal rulemaking process

    Featured Topics

    • Forms Search for a government form.
    • Per diem FAQs Frequently asked questions about per diem rates and related topics.
    • Explore small business
    • Small business goals
    • Register your business
      Toggle submenu
      • Explore business models
      • Research the federal market
      • Subcontracting and other partnerships
    • Forecast of contracting opportunities
    • Small business resources
      Toggle submenu
      • Events and contacts
      • Small business contacts
      • Training
      • Videos

    Featured Topics

    • Forecast tool Information on planned federal contracting opportunities.
    • Socio economic categories Check your eligibility for small-business set-asides.
    • Training and videos Suggested training for doing business with us.
    • Explore travel
    • Plan a trip
      Toggle submenu
      • Per diem rates
      • Transportation (airfare rates, POV rates, etc.)
      • Lodging
      • State tax exemption
      • Travel charge card
      • Conferences and meetings
    • Travel and lodging services
      Toggle submenu
      • E-gov travel service (ETS)
      • Rideshare
      • Travel category schedule
    • Federal travel regulation
    • Travel policy

    Featured Topics

    • Per diem rates look-up Allowances for lodging, meal and incidental costs while on official government travel.
    • Mileage reimbursement rates Reimbursement rates for the use of your own vehicle while on official government travel.
    • Explore technology
    • Build websites and digital services
    • Products and services
      Toggle submenu
      • Cloud computing services
      • Cybersecurity products and services
      • Data center services
      • Hardware products and services
      • Professional IT services
      • Software products and services
      • Telecommunications and network services
      • Work with small businesses
    • Purchasing programs
      Toggle submenu
      • Governmentwide acquisition contracts
      • IT category
      • MAS information technology
      • Software purchase agreements
      • Telecommunications and network services
      • USAccess
    • Government initiatives
      Toggle submenu
      • 18F
      • Cybersecurity
      • Digital strategy
      • Emerging citizen technology
      • FedRAMP
      • Federal identity, credentials, and access management
      • Mobile government
      • Technology modernization fund
      • Artificial Intelligence
      • Robotic process automation community
    • Training
    • IT policy

    Featured Topics

    • Challenge.gov Government sponsored challenges and prize competitions.
    • Data.gov Access U.S. government data.
    • Multiple award schedule IT category Information technology products, services and solutions.
    • Explore about us
    • Annual reports
    • Background and history
      Toggle submenu
      • Overview
      • Mission and strategic goals
      • Role in presidential transitions
    • Careers
      Toggle submenu
      • Get an internship
      • Launch your career
      • Elevate your professional career
      • Discover special hiring paths
      • Resources and related links
    • Climate Action
    • Events and training
      Toggle submenu
      • Our training programs
    • Newsroom
      Toggle submenu
      • Agency blog
      • Congressional testimony
      • GSA does that podcast
      • News releases
      • Speeches
      • Videos
    • Organization
      Toggle submenu
      • Leadership directory
      • Staff directory
      • Office of the Administrator
      • Federal Acquisition Service
      • Public Buildings Service
      • Staff offices
      • Board of Contract Appeals
      • Office of Inspector General
    • Regions
      Toggle submenu
      • Region 1 | New England
      • Region 2 | Northeast and Caribbean
      • Region 3 | Mid-Atlantic
      • Region 4 | Southeast Sunbelt
      • Region 5 | Great Lakes
      • Region 6 | Heartland
      • Region 7 | Greater Southwest
      • Region 8 | Rocky Mountain
      • Region 9 | Pacific Rim
      • Region 10 | Northwest/Arctic
      • Region 11 | National Capital Region
    • Contact us

    Featured Topics

    • Blog Read the latest GSA news, updates and analysis.
    • Careers Learn what we have to offer.
  • Per diem lookup
Buy through us
Explore buy through us
Category management
Government property for sale or lease
Personal property (tangible goods)
Real property (real estate and buildings) for public use
Real property sales
Vehicle sales
Products and services
Facilities and construction
Human capital
Industrial products and services
Information technology
Office management
Professional services
Security and protection
Transportation and logistics services
Travel and lodging
Purchasing programs
Multiple award schedule
SmartPay (charge card services)
Assisted acquisition
Commercial platforms
Emergency acquisition basic ordering agreements
Federal strategic sourcing initiative
Fleet management
HCaTS and HCaTS SB
OASIS and OASIS SB
Requisition programs
State and local programs
Technology programs
8(a) set asides on GSA contracts
Shared services
Charge cards and payments (SmartPay)
Disposal of excess property
Fleet management
Interagency invoicing (G-Invoicing)
Payroll services
Quality service management offices
Support services for CABs
Website and digital services
Sell to government
Explore sell to government
Step 1: Learn about government contracting
Ways you can sell to government
How to access contract opportunities
Conduct market research
Step 2: Compete for a contract
Register your business
Certify as a small business
Become a schedule holder
Market your business
Research active solicitations
Respond to a solicitation
What to expect during the award process
Step 3: Manage your contract
Comply with contractual requirements
Handle contract modifications
Monitor past performance evaluations
Real estate
Explore real estate
Design and construction
3D-4D building information modeling
Art in architecture | Fine arts
Computer-aided design standards
Commissioning
Design excellence
Engineering
Project management information system
Spatial data management
Prospectus thresholds
Facilities management
Facilities operations
Security
Smart buildings
Tenant services
Utility services
Water quality management
Historic preservation
Explore historic buildings
Heritage tourism
Historic preservation policy, tools and resources
Historic building stewardship
Videos, pictures, posters and more
NEPA implementation
Our properties
Courthouse program
Land ports of entry
Lighthouses
Owned and leased properties
Prospectus library
Regional buildings
Renting property
Visiting public buildings
Real estate services
Leasing
Real property disposal
Reimbursable services (RWA)
Rental policy and procedures
Site selection and relocation
For businesses seeking opportunities
For federal customers
For workers in federal buildings
Voice of the customer
Workplace
Commercial coworking
Federal coworking
Policy and regulations
Explore policy and regulations
Policy
Acquisition management policy
Aviation management policy
Information technology policy
Real property management policy
Relocation management policy
Travel management policy
Vehicle management policy
Regulations
Federal acquisition regulations
Federal management regulations
Federal travel regulations
GSA acquisition manual
Managing the federal rulemaking process
Small business
Explore small business
Small business goals
Register your business
Explore business models
Research the federal market
Subcontracting and other partnerships
Forecast of contracting opportunities
Small business resources
Events and contacts
Small business contacts
Small business contacts
Training
Videos
Travel
Explore travel
Plan a trip
Per diem rates
Transportation (airfare rates, POV rates, etc.)
Lodging
State tax exemption
Travel charge card
Conferences and meetings
Travel and lodging services
E-gov travel service (ETS)
Rideshare
Travel category schedule
Federal travel regulation
Travel policy
Technology
Explore technology
Build websites and digital services
Products and services
Cloud computing services
Cybersecurity products and services
Data center services
Hardware products and services
Professional IT services
Software products and services
Telecommunications and network services
Work with small businesses
Purchasing programs
Governmentwide acquisition contracts
IT category
MAS information technology
Software purchase agreements
Telecommunications and network services
USAccess
Government initiatives
18F
Cybersecurity
Digital strategy
Emerging citizen technology
FedRAMP
Federal identity, credentials, and access management
Mobile government
Technology modernization fund
Artificial Intelligence
Robotic process automation community
Training
IT policy
About us
Explore about us
Annual reports
Background and history
Overview
Mission and strategic goals
Role in presidential transitions
Careers
Get an internship
Launch your career
Elevate your professional career
Discover special hiring paths
Resources and related links
Climate Action
Events and training
Our training programs
Newsroom
Agency blog
Congressional testimony
GSA does that podcast
News releases
Speeches
Videos
Organization
Leadership directory
Staff directory
Office of the Administrator
Federal Acquisition Service
Public Buildings Service
Staff offices
Board of Contract Appeals
Office of Inspector General
Regions
Region 1 | New England
Region 2 | Northeast and Caribbean
Region 3 | Mid-Atlantic
Region 4 | Southeast Sunbelt
Region 5 | Great Lakes
Region 6 | Heartland
Region 7 | Greater Southwest
Region 8 | Rocky Mountain
Region 9 | Pacific Rim
Region 10 | Northwest/Arctic
Region 11 | National Capital Region
Contact us
  1. Home
  2. Governmentwide Initiatives
  3. Federal High-Performance Green Buildings
  4. Resource Library
  5. Energy & Water
  6. Plug Loads
  7. Plug Load (FAQ)

Plug Load Frequently Asked Questions (FAQ)

  1. Introduction
  2. Who needs to know about plug loads?
  3. What core concepts can I learn from this FAQ document?
  4. What are plug loads?
  5. How do plug loads use energy?
  6. Why do we care about plug loads
  7. Can’t equipment power management reduce plug loads?
  8. What can we do to reduce plug loads?
  9. What outcomes can we target?
  10. What are best practices for reducing plug loads?
  11. Research and Citations
  1. Introduction

    Plug loads are “orphans.” Until recently, no one really took notice of plug loads. They were not considered important, and no one had the responsibility to track or manage them. But, that is changing. As buildings become more energy efficient, the significant impact of plug loads becomes more apparent. In high efficiency buildings, plug loads may account for more than 50% of the total energy consumption.

    This FAQ document is a result of information compiled from research on plug load programs addressing energy impacts in government, private, and institutional facilities. Research citations are included in the text below and are summarized at the end of this document. This Plug Load FAQ can help identify no-cost and low-cost options to reduce plug loads and illustrates the growing need to “adopt-a-plug load.”

  2. Who needs to know about plug loads?

    Research shows that the most successful approach to reducing plug loads is an integrated team approach. Plug load reduction programs need an organized team and a “champion” to lead it. The champion should be a charismatic leader who understands the dynamics of facilitating an integrated team, and is enthused with rallying people around the “cause.” Facility Managers, Facility Operators, and Energy Managers are the people who are most responsible for energy use and operations at federal facilities. They may be in the best position to support and lead an integrated team approach.

    The team should include a broad range of perspectives - those who use the equipment, those who maintain the equipment, as well as those who may determine (or influence) which types of equipment are purchased/leased. Ideally, the team includes members representing Finance, Procurement, Facility Operators, Office Managers and Office Staff (equipment users). They will be valuable contributors to determining options and solutions for the plug load program. The more they know about plug loads the more the program can apply no-cost and low cost solutions.

  3. What core concepts can I learn from the FAQ document?

    • Plug loads are significant factors in energy budgets.
    • Plug loads can be addressed for existing buildings as well as new construction.
    • There are no-cost and low cost options available to reduce plug loads.
    • As buildings become more energy efficient, plug load reduction becomes more relevant.
    • Plug loads have not been predominant in many energy reduction programs and therefore have not had “champions.”
    • An integrated team approach is essential to the long-term success of plug load management strategies.
  4. What are plug loads?

    Plug loads are energy used by equipment that is usually plugged into an outlet. “Computers and monitors accounted for 66% of all [plug load] devices; office electronics (printers, faxes, multifunction devices and computer speakers) accounted for 17% of all devices; miscellaneous devices (portable lighting, telephones, and coffee makers) accounted for the remaining 17% of all plug load devices.” (Moorefield, L., et al. 2008). Other devices included in the research include battery chargers, vending machines, and refrigerators (Roberson, J. et al. 2004).

    Plug loads are not related to general building lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants.

  5. How do plug loads use energy?

    Modern electronic equipment usually incorporates a variety of power levels, or “modes” and is usually “on” continuously at some power level. The various modes allow for power management of the equipment – correlating the power mode to the user’s activity level. Most common modes are active, standby, and off. Active mode powers equipment as it is being operated, and is the most energy intensive. Standby mode leaves equipment on, but powered-down either automatically when the equipment has been idle for a specified time, or manually placed in standby by the user. Electronic devices will return to active mode when a user engages the equipment. Off mode either does not draw any power or draws very little power because it has been manually turned off or unplugged by the user. Many electronic devices never completely turn off in order to start quickly when the user activates the device. These are called “parasitic loads.” For example, the DVD player has been switched off using the remote, but it is still connected to the power socket and so continues to draw a small quantity of power. Parasitic loads are also known as “phantom loads” or “vampire loads.”

  6. Why do we care about plug loads?

    Plug loads can be surprisingly large. Minimizing plug loads is a primary challenge in the design and operation of an energy-efficient building. Plug loads in commercial buildings account for almost 5% of U.S. primary energy consumption (NREL 2011). On average, plug loads account for approximately 30% of electricity in offices (Moorefield, L., et al. (2008). In minimally code-compliant office buildings, plug loads may account for 25% or less of total energy consumption; in high efficiency buildings, plug loads may account for more than 50% of the total energy consumption (Poll, S. and C. Teubert 2012).

    Aggregated impacts of plug loads are significant. As an example, researchers (Moorefield, L., et al. 2008) estimated that California’s office plug loads consume more than 3,000 gigawatt hours annually, costing business owners more than $400 million each year. The associated carbon dioxide emissions of these plug loads is more than 700,000 metric tons annually—equivalent to the carbon dioxide emissions of 140,000 cars during one year. The equipment inventory showed that offices contained on average 7 devices per employee and 30 plug load devices per 1,000 square feet of office space.

  7. Can’t equipment power management reduce plug loads?

    Research reveals that power management does not operate in isolation, but rather is subject to complexities of the workplace environment. For example, a problematic aspect of devices “waking up” is the delay in activating. This delay often frustrates users. Equipment is often left in active mode when not in use - especially networked equipment. (Roberson, J. et al. 2004). Energy Star labeled products have factory installed power management settings that require the device to enter a low power mode, however users, administrators, and software updates often disable these settings. Several reports studied trends in turn-off rates and concluded that turn-offs were reduced in the more recent studies.

    Power management was found to be most successful in monitors and laser printers, and least successful in desktop computers, inkjet printers, copiers, and fax machines (Roberson, J. et al 2004). This study utilized a three-year previous study and considered related trends in commercial buildings, education buildings, medical buildings, and offices. It reported that of the computers inventoried during their after hours survey, only 6% of turned-on computers had power management enabled. Turn off rates for computers (36%) and monitors (29%) were somewhat lower than the study 3 years prior. Power management rates for monitors (72%) were higher by 16%. Power management was lowest in high schools and small offices and highest in universities and large offices. This may indicate the influence of centralized IT departments and effective occupant behavior policy.

  8. What can we do to reduce plug loads?

    The referenced research papers provide recommendations and strategies for reducing plug and process loads. Several identify a team approach. For instance, the report on NREL’s Research Support Facility (NREL 2011) [PDF] recommends project design though an integrated team, and a strategy as follows:

    • Establish a plug loads champion.
    • Develop a business case for addressing plug loads.
    • Benchmark your conventional equipment and operations.
    • Be willing to identify occupants’ true needs.
    • Meet needs as efficiently as possible.
    • Turning it all off.
    • Institutionalize plug load measures through procurement decisions and policy programs.
    • Address unique miscellaneous plug loads.
    • Occupant awareness, education, and feedback.
    • Encourage the design team to identify applicable plug load strategies.

    See Plug Load Management Plugload Checklist [PDF - 97 KB].

    The NREL facility design team was contractually required to meet a whole-building energy use goal that included plug loads. To accurately account for plug loads, the team required input from NREL on previous and proposed equipment and use. A team (owner, tenants, engineers, architect, IT, procurement staff, facility operator and NREL researchers) helped in making decisions about efficient plug loads and was assigned to be plug load champions.

    Other effective strategies employ interventions such as choosing energy efficient equipment to replace legacy equipment, setting effective energy policies, promoting beneficial occupant behavior, and employing plug-load controls such as load sensing and scheduled timer controls. (Poll, S. and C. Teubert (2012).

  9. What outcomes can we target?

    Best practices can include no-cost and low-cost options. Variables affecting project targets may include project budget, and projected return on investment (ROI). But, plug load reductions in the 50% range are achievable. As an example of a successful plug loads reduction effort, NREL’s Research Support Facility had the goal of becoming a “net zero” office facility. In order to reach this goal, NREL would need to achieve a 50% reduction from estimated legacy plug loads energy use (NREL 2011). Their plug and process load is estimated to be 18.5 kBTU/ft2/yr – reduced from projected baseline of 35.1 kBTU/ft2/yr.

  10. What are the best practices for reducing plug loads?

    In addition to utilizing an integrated team approach, research highlights the following plug load interventions:

    Enable power management features: (Kawamoto, K., Y. Shimoda, et al. 2004) (Webber, C. A., et al. 2006)

    By enabling the power management in computers, the energy use in non-business hours can be decreased by 60%. Reducing time delays can reduce it even further.

    For copiers, when power management is built-in and properly functioning, about 90% of the energy use in non-business hours can be saved.

    For laser printers, without power management, about 50% of energy is used in non-business hours, and 45% of energy is used during idling in business hours. Power management in laser printers based upon these data could reduce energy used by up to 95%

    Install schedule timer plug strips: (Moorefield, L., et al. 2008) (Acker, B., et al. 2012) (Metzger, I., et al. (2012)

    Plug strips included in the research are schedule timer plug strips, occupancy and load-sensing plug strips. Timed plug strips out perform all other plug strip interventions. [1] The payback period for a $100 device was best for the schedule timer controls, at an average of 3.425 years for all devices combined. The average payback period for the load-sensing controls and occupancy sensing was 30.5 years and 13.9 years for all devices combined.

    Before implementing smart plug strips consider the cost of energy at the site, and whether centralized solutions are in place to switch non-essential systems on and off.

    Energy efficient equipment: (Roberson, J. et al 2004) (NREL 2011) (Acker, B., et al. 2012) (Moorefield, L., et al. 2008) (Nordman, B., et al. 2000) (Lobato, C., et al. 2011)

    Specify energy efficient Energy Star equipment, and pay special attention to parasitic loads in order to use efficient equipment in the most efficient manner.

    Replace desktops with laptops when appropriate. Laptops are 76% more energy efficient than desktop computers. Desktops are in active mode about 30% of the time whereas laptops are in active mode only 10% of the time. On average, desktop computers are in standby or sleep 50% of the time and disconnected 7% of the time. Laptops are in standby or sleep 58% of the time and disconnected 26% of the time.

    Replace CRT monitors with LCD monitors. CRT monitors used 14-49% more power than LCD monitors depending on the mode, though 79% of monitors inventoried were LCD monitors.

    Laser printers, multi-function devices and inkjet printers. Inkjet printers and multifunction devices are 70% more energy efficient than laser printers. For laser printers without power management about 50% of energy is used in non-business hours. For laser printers with power management, 45% of energy is used during idling in business hours. Among the sample of printers, 46% were laser and 34% were inkjet. (Roberson, J. et al 2004). The turn-off rate was twice as high (30%) for inkjet printers as for laser printers (15%); inkjet printers are more likely to be turned off than laser printers because they are much less likely to be networked.

    “Nonrated equipment must be researched to find the most efficient model, which should be turned off when not in use, if possible. Parasitic loads require special attention, even if the equipment is energy efficient. There will always a more efficient way to perform operations. This is accomplished by using more efficient equipment in a more efficient manner.” (NREL 2011)

    NOTE: Plug load management teams should consider that the building occupants and equipment users typically know best about a facility’s and workforce’s needs. ROI of equipment upgrades and occupant behavior modifications must consider the trade offs between environmental impacts and worker productivity. For instance, laser printers may be considered most productive because of high speed printing, double side printing, collation, etc. Inkjet and multi-function devices may be more relevant in small offices and for specific office environments.

    Occupant behavior modification: (NREL. 2011) (Poll, S. and C. Teubert 2012) (Metzger, I., et al. 2012)

    Provide occupant training. Lack of occupant training can lead to disabling of controls. Many users are annoyed by delays of power management, and so disable it or set a long time delay like 60 minutes. Technological innovation to shorten the inconvenience of wake-up from power management is necessary to achieve more energy savings by power management.

    Work with IT to allow occupants to power down at night. Though not technically part of automatic power management, the degree to which people turn off equipment by hand can be as important to energy use and savings as power management. Research shows power management can reduce energy demand by over 60% (Nordman, B., et al. 2000). The desktop turn off rate was 36% (laptops not included), CRT monitors was 32%, and LCD monitors was 18% (Webber, C. A., et al. 2006).

    Establish effective energy policies (Poll, S. and C. Teubert 2012). From the energy perspective, changing energy saver policies to transition to the lowest power mode (standby) was found to save more energy than schedule-based control where loads were completely de-energized during off-hours. This is especially effective on devices such as computers, monitors, copiers, and printers. However, from a productivity perspective, a balance must be struck between energy savings and inconvenience to users due to wake-up times delays. For monitors, the wake time is typically insignificant; but for printers and copiers, the warm-up times can range from a few seconds to minutes.

  11. Research and citations

    GSA has recognized the significance of energy and related environmental impacts of office equipment and engaged contractors to provide research of relevant literature on process and plug loads. Research papers cited for plug loads include the following:

    1. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment; Judy A. Roberson, C. A. W., Marla C. McWhinney, Richard E. Brown, Margaret J. Pinckard, and John F. Busch. (2004).
    2. Assessing and Reducing Plug and Process Loads in Office Buildings; NREL. (2011). Golden, CO.
    3. Office Plug Load Field Monitoring Report; Moorefield, L., et al. (2008). Portland, OR, Ecos: 74.
    4. Energy saving potential of office equipment power management; Kawamoto, K., Y. Shimoda, et al. (2004). Energy and Buildings 36(9): 915-923.
    5. Pilot study of a plug load management system: Preparing for sustainability base; Poll, S. and C. Teubert (2012). 2012 IEEE Green Technologies Conference, April 19, 2012 - April 20, 2012, Tulsa, OK, IEEE Computer Society.
    6. Energy conservation potential of power management for fax machines; Newsham, G. R. and D. K. Tiller (1995).” Energy and Buildings 23(2): [d]121-130.
    7. Office Building Plug Load Profiles; Acker, B., et al. (2012); Boise, ID., University of Idaho: 53.
    8. Reducing plug and process loads for a large scale, low energy office building; Lobato, C., et al. (2011). NREL’s research support facility. 2011 ASHRAE Winter Conference, January 29, 2011 - February 2, 2011, Las Vegas, NV.
    9. PC and monitor night status: Power management enabling and manual turn-off; Nordman, B., et al. (2000). Proceedings ACEEE Summer Study on Energy Efficiency in Buildings 7: 7.89-87.99.
    10. After-hours power status of office equipment in the USA; Webber, C. A., et al. (2006). “ Energy 31(14): 2487-2502.
    11. Plug-Load Control and Behavioral Change Research in GSA Office Buildings; Metzger, I., et al. (2012). GSA Green Proving Ground Program. NREL: 47.

[1] (Acker, B., et al. 2012) The report also suggested a need for future work surrounding the effect of smart plug strips and occupancy sensors to control outlet power and the implementation of user education campaigns to raise awareness of the total power contribution of plug loads. Of the plug strip interventions (occupancy sensor plug strips and load-sensing plug strips), savings per device controlled was comparable. The average savings with the occupancy sensor plug strip was 16.97% during the weekday, 28.39% during the weekend, and 36.22% during the holidays, for a total average of 27.19%. For the load sensing plug strips, the average savings was 19.75% during the weekday, 25.14% during the weekend, and 38.41% during the holidays, for a total average of 27.77%.

Print Page Email Page
Last updated: Aug 12, 2024
Top
    • Overview
    • Resource Library
      • Energy & Water
        • Plug Loads
          • Plug Load (FAQ)
          • Plug Load Nuggets
        • Submetering
        • Fort Carson energy research project
      • Health
      • Integrative strategies
      • Building operations
      • Safeguarding Assets
      • Sustainable Acquisition
    • Green Building Advisory Committee

Home

  • Resources for …
    • Americans with Disabilities
    • Citizens and Consumers
    • Federal Employees
    • GSA Employees
    • Native American affairs
    • Presidential & Congressional Commissions, Boards or Small Agencies
    • Small Business
  • Governmentwide Initiatives
    • Centers of Excellence
    • Digital experience
    • Emergency response
    • Federal Cybersecurity
    • ID, Credentials, and Access Management
    • Information Quality
    • Open Data
    • Technology Modernization Fund
  • Contact Us
  • Organization
    • Leadership Directory
    • Staff Directory
  • References
    • Agency Financial Report
    • Plain Language
    • Budget and Performance
    • Catalogs
    • Orders & Directives
    • Forms
  • Website Information
    • A-Z Index
    • Report a website issue
    • Sitemap
  • Also of Interest
    • Data.gov
    • Whitehouse.gov
  • Tools
    • eBuy
    • eLibrary
    • Contracting forecast tool
    • GSA Advantage
    • GSA Auctions
GSA logo
  • Facebook
  • X
  • LinkedIn
  • YouTube
  • instagram
  • Blog
  • email

JOIN THE CONVERSATION

GSA.gov

An official website of the U.S. General Services Administration

  • Accessibility statement
  • Website Policies
  • Reports
  • Office of the Inspector General
  • No FEAR Act
  • FOIA Requests
  • Board of Contract Appeals
Looking for U.S. government information and services?
Visit USA.gov

PER DIEM LOOK-UP

1 Choose a location

Error, The Per Diem API is not responding. Please try again later.

No results could be found for the location you've entered.

Get my location

OR

OR

Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.

Rates for foreign countries are set by the Department of State.

2 Choose a date


OR

Rates are available between 10/1/2023 and 09/30/2026.

The End Date of your trip can not occur before the Start Date.

 
 
Additional terms and conditions

Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained.

Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries."

Per diem localities with county definitions shall include"all locations within, or entirely surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties, including independent entities located within the boundaries of the key city and the listed counties (unless otherwise listed separately)."

When a military installation or Government - related facility(whether or not specifically named) is located partially within more than one city or county boundary, the applicable per diem rate for the entire installation or facility is the higher of the rates which apply to the cities and / or counties, even though part(s) of such activities may be located outside the defined per diem locality.